Main guide

Pile integrity testing: Cross-Hole, PIT and mechanical admittance

Compare Cross-Hole, PIT and mechanical admittance to assess foundation-pile integrity, continuity and length, with practical preparation and interpretation limits.

An unusual signal is not yet a diagnosis. The client needs to establish what information supports the decision and which test can obtain it under the actual pile conditions.

Why assess foundation piles?

A foundation that cannot be directly inspected may require checks of concrete continuity and homogeneity, assessment of expected length or investigation of a construction anomaly. Define the objective, geometry and available records before selecting equipment.

Integrity testing alone does not establish load-bearing capacity and is not a load test. Even an absence of recognisable anomalies must be qualified by the volume examined and the method’s limitations.

Choosing the methodology

Cross-Hole/CSL examines ultrasonic paths between installed tubes; PIT/PEM and mechanical admittance/TRM examine the vibrational response from the pile head. They provide different information: no method is universally superior.

Tube availability, head access, construction stage, expected length and diagnostic question guide the choice. Combine methods when this addresses a specific uncertainty, not simply to increase the number of tests.

Cross-Hole / CSL: ultrasonic paths through concrete

Transmitting and receiving probes travel through access tubes installed in the pile. Measurements at comparable depths describe ultrasonic pulse transmission through the concrete between the tubes.

First-arrival times and signal characteristics may identify intervals requiring investigation. Tube access and continuity, coupling and path geometry matter. Coverage does not automatically extend to the whole pile, particularly outside the tested paths.

PIT / Pulse Echo: low-strain response

An impact at the pile head generates a wave; a receiver records the response, often initially as acceleration. Reflections can originate at the toe or at changes in impedance along the pile.

The echo relation 2L = Vm × T links estimated length L, assumed wave velocity Vm and round-trip time T. Length depends on identifying the reflection and choosing the velocity; it is not measured independently of these assumptions.

Mechanical admittance / Transient Response

TRM relates response velocity to impact force and examines admittance in the frequency domain. Resonances can contribute to dimensional assessment and investigation of anomalies.

Length indications and an inferred profile depend on the model and boundary conditions. An interpreted profile is not a directly measured geometry or certification of the actual cross-section.

Preparation and client information

Supply pile identifiers, drawings, expected lengths and diameters, casting dates, ground stratigraphy and available construction records. Identify section changes, structural connections, casting difficulties and previous tests.

Agree on access and safety, head preparation for PIT/TRM and tube checks for CSL. Geometric applicability conditions cited in the SolGeo manual are document-specific criteria requiring verification for the actual configuration; no unverified numerical thresholds are introduced here.

Interpretation: from measurement to assessment

Geometry, ground, concrete, restraints and construction history affect the response. A reflection or signal variation cannot automatically be translated into a specific defect.

Reports should distinguish acquired data, interpretive assumptions, unassessable areas and reasons for supplementary investigation. A poorly readable signal justifies neither automatic acceptance nor automatic rejection.

The Novatest Engineering approach

Start with the client’s question: review records, select methods and execution conditions, acquire traceable data, process results and interpret them in context.

Deliverables explain findings, assumptions and limitations to support the designer’s decisions. Novatest Engineering is the technical consultancy addressed by these pages; undocumented activities or performance are not attributed to Novatest S.r.l.

Documentary basis and application caution

The reference identified for PIT/PEM and TRM is the SolGeo “All-in One System Echo PIT – User Manual”. Official SolGeo pages confirm the echo/admittance distinction and velocity-to-force relationship. The full text of section 2.3 is unavailable for detailed verification of geometric conditions.

CSL is described at the level of general principles, without unverified equipment specifications, acceptance thresholds or standards. Operational decisions require review of the documentation applicable to the project.

Comparison by survey objective

MethodPrincipleAccessExecution stageInformation obtainableMain limitationsTypical applications
Cross-Hole / CSLUltrasonic transmission between probesInstalled, traversable tubesPlanned before casting; measurement with accessible tubesSignal variations by path and depthTube-to-tube coverage; coupling or tube problemsInvestigation of concrete along installed paths
PIT / PEMLow-strain impulse reflectionsAccessible, suitable headWhen the head is available and concrete suitableReflections, estimated length and impedance changesAssumed velocity, attenuation, geometry and restraintsDimensional assessment and head-based anomaly investigation
Mechanical admittance / TRMVelocity/force relationship in frequencySuitable head; force and response acquisitionWhen consistent impact and measurement are possibleResonances, dimensional indications and inferred profileInterpretive model, ground and boundary conditionsFrequency-domain vibrational investigation

Related guides

Frequently asked questions

Do integrity tests measure load-bearing capacity?
No. They assess aspects of integrity or pile response within method limitations; they do not replace a load-capacity assessment.
Which method is always best?
None: the objective, access and pile conditions determine what information can be obtained.
Is estimated length certain?
No: it depends on velocity assumptions, identifying the response and boundary conditions.

References and documentary scope

What information does your project need?

Share the objective, site constraints and required deliverables so we can assess an appropriate survey strategy.

Submit your case